Data centres represent one of the most complex challenges in corporate construction. They demand a rigorous approach, seamless coordination and top-level technical expertise.
Axess deploys all its capabilities to design and build this type of infrastructure with the same exacting standards as any strategic property project.
Building a data centre mobilises a wide range of stakeholders and technical skills. To guarantee overall coherence and quality, Axess offers end-to-end support from initial analysis to turnkey delivery.
- Feasibility studies integrating energy, regulatory and technical issues
- All-trades coordination through a single point of contact
- General contractor or design-and-build methodology
- Commitment to quality, cost, deadlines and safety
Committed to overall performance, Axess designs buildings that are both technical and resource-efficient. Our teams integrate QSE (Quality, Safety, Environment) principles from the outset and support you in achieving the certification levels suited to your project.
- High-performance energy solutions (cooling, ventilation, controlled PUE)
- Integration of sustainable materials
- Carbon footprint reduction across the entire lifecycle
- Anticipation of certifications (HQE, BREEAM, ISO, etc.)
A committed team, structured to tackle complex projects
Axess’s organisation is built on agility, proximity and complementarity. Our 13 branches and business units work together to deliver each project.
Axess, a trusted partner for your digital infrastructure
What sets Axess apart is the combination of an engineering culture, strong local presence and total commitment to our clients. We believe in co-construction, transparency and shared efficiency.
Our teams don’t just build walls: they build tools for the future, sized to support our clients’ business today and tomorrow.
Considering a data centre project? We are ready to make it an example of performance, rigour and innovation. Trust Axess to build the infrastructure that will drive your digital strategy.